Summary

SPRSW210257
Construction Stormwater
Permit(s) Issued
GONDOLA SQUARE CONDOS
New
Gondola Relocation Project
09/15/2021

Locations

Property
211077001

Address
2305 MT WERNER CIR

Permits

Permit Number: SPRSW210257-SW1

Construction Stormwater
Permit(s) Issued

Permit Number: SPRSW210257-LD1

Land Disturbance
Permit(s) Issued

Reviews

There are no reviews for this permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Final Construction Stormwater Pending
Scott Slamal
90 Day Inspection Pending 5/2/2025
Scott Slamal
45 Day Inspection Failed 9/24/2021 09/24/2021
Scott Slamal
45 Day Inspection Passed 9/20/2021 09/27/2021
Scott Slamal
45 Day Inspection Failed 10/11/2021 10/11/2021
Scott Slamal
45 Day Inspection Failed 10/13/2021 10/13/2021
Scott Slamal
45 Day Inspection Failed 10/26/2021 10/26/2021
Scott Slamal
45 Day Inspection Failed 11/4/2021 11/04/2021
Scott Slamal
45 Day Inspection Failed 4/22/2022 04/22/2022
Scott Slamal
Corrections:


Sediment Discharges
Carried Forward
04/26/2022
Install additional rocks socks to increase capacity and filtration at inlet across from old Preview Lift. Email photos of corrections once completed to Scott Slamal.

45 Day Inspection Failed 5/3/2022 05/03/2022
Scott Slamal
Corrections:


Sediment Discharges
Resolved
05/03/2022

Inlet Protection
Carried Forward
05/03/2022
Install additional Dandy Bag inlet protection at the two inlets adjacent to the new gondola terminal.

Sediment Discharges
Carried Forward
05/03/2022
Control measure implementation was inadequate to control sediment discharges to Burgess Creek.

45 Day Inspection Failed 6/2/2022 06/02/2022
Scott Slamal
Corrections:


Inlet Protection
Resolved
06/03/2022
Install additional Dandy Bag inlet protection at the two inlets adjacent to the new gondola terminal.

Sediment Discharges
Resolved
06/03/2022
Control measure implementation was inadequate to control sediment discharges to Burgess Creek.

Maintenance activities
Resolved
06/08/2022
Sediment accumulation at check dams along drainage swale at base area and at inlets needs to be removed to restore capacity at these locations. Email Scott Slamal photos once corrections are completed. Corrections made 6/3-6/7 see photo document showing corrections.

45 Day Inspection Passed 7/12/2022 07/07/2022
Scott Slamal
Corrections:


Maintenance activities
Resolved
07/08/2022
Sediment accumulation at check dams along drainage swale at base area and at inlets needs to be removed to restore capacity at these locations.

45 Day Inspection Passed 8/18/2022 08/21/2022
Scott Slamal
45 Day Inspection Passed 9/29/2022 08/31/2022
Scott Slamal
45 Day Inspection Failed 11/19/2022 10/05/2022
Scott Slamal
Corrections:


Inlet Protection
Carried Forward
10/05/2022
Install inlet protection at newly installed inlet at base of wild blue gondola terminal.

45 Day Inspection Failed 12/19/2022 11/01/2022
Scott Slamal
Corrections:


Inlet Protection
Carried Forward
11/04/2022
Install inlet protection at newly installed inlet at base of wild blue gondola terminal.

Vehicle tracking
Carried Forward
11/04/2022
FODs tracking pad was in need of maintenance. Sediment tracking was observed on Ski Time Square Dr.

45 Day Inspection Passed 4/26/2023 05/04/2023
Scott Slamal
Corrections:


Inlet Protection
Resolved
05/04/2023
Install inlet protection at newly installed inlet at base of wild blue gondola terminal.

Vehicle tracking
Resolved
05/04/2023
FODs tracking pad was in need of maintenance. Sediment tracking was observed on Ski Time Square Dr.

45 Day Inspection Passed 6/18/2023 06/16/2023
Scott Slamal
45 Day Inspection Passed 7/31/2023 07/27/2023
Scott Slamal
45 Day Inspection Passed 9/10/2023 09/08/2023
Scott Slamal
90 Day Inspection Failed 5/3/2024 05/15/2024
Scott Slamal
Corrections:


Miscellaneous
Carried Forward
05/15/2024
The practice of cleaning out accumulated sediment from check dams along the Right of Way trail while runoff is occurring is causing sediment to discharge from the base area drainage to Burgess Creek. This practice needs to be re-evaluated and only occur when runoff is not occurring in the ditch. Please respond with a narrative outlining how this will be addressed in the future.

90 Day Inspection Partial Pass 8/13/2024 08/14/2024
Scott Slamal
Corrections:


Miscellaneous
Carried Forward
08/14/2024
The practice of cleaning out accumulated sediment from check dams along the Right of Way trail while runoff is occurring is causing sediment to discharge from the base area drainage to Burgess Creek. This practice needs to be re-evaluated and only occur when runoff is not occurring in the ditch. Please respond with a narrative outlining how this will be addressed in the future.

Conditions

There are no conditions for this engineering permit application, or you are not authorized to view them.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
08/18/2022 image
08/18/2022 image0
08/18/2022 image1
08/18/2022 image2
08/18/2022 image3
08/18/2022 image4
08/18/2022 image5
10/05/2022 224FDAF7-00B3-4C6C-AA27-8290614B4259
10/05/2022 6A4CC5EC-168B-4AC2-98DF-A6D3231415FC
10/05/2022 847B4B42-BDBC-4A24-A5A0-3B247FC6DE2C
10/05/2022 367E480F-0D1D-45F7-B45C-39BD4AC9E059
10/05/2022 19EDD35B-C764-4D67-A520-6486E8E68467
10/05/2022 A2CE08EC-9920-4DCF-B979-109A57FE8C4B
10/05/2022 873E95AD-F6FF-42CA-A992-DAA41A30B01F
10/05/2022 F20BE086-37E9-482D-9BAC-1B7C141A9943
10/05/2022 FB233707-2978-4951-B42D-883DF7A693C6
10/05/2022 8CE3A3CF-5C79-43D0-8372-B6D7C31C75EE
11/03/2022 Tracking
11/03/2022 VTC needing maintenance
11/03/2022 Christy base
11/03/2022 Christy base2
11/03/2022 CPXGradingSlopes-hydromulch thin or sparse
11/03/2022 CPXGradingSlopes-hydromulch thin or sparse 0
11/03/2022 CPXGradingSlopes-hydromulch thin or sparse 1
11/03/2022 Sediment basin-no ECB or stabilized outlet
11/03/2022 No inlet protection
11/03/2022 CPX base-blankets not fully covering all disturbed soils
11/03/2022 Bottom of main drainage appears not substantial and could jump
11/10/2022 11072023InletFailure
11/10/2022 11072023Burgess Creek blow ski trail
11/10/2022 11072022PrimarySwaleFailure
11/10/2022 11072022PrimarySwaleFailure0
05/04/2023 IMG_0582
05/04/2023 IMG_0581
05/04/2023 IMG_0579
05/04/2023 IMG_0577
05/04/2023 IMG_0578
05/12/2023 IMG_0632
05/12/2023 IMG_0624
05/12/2023 IMG_0627
05/12/2023 IMG_0623
07/27/2023 IMG_0921
07/27/2023 IMG_0925
07/27/2023 IMG_0928
07/27/2023 IMG_0926
07/27/2023 IMG_0924
07/27/2023 IMG_0922
07/27/2023 IMG_0927
07/27/2023 IMG_0920
07/27/2023 IMG_0923
07/27/2023 IMG_0929
07/27/2023 IMG_0931
07/27/2023 IMG_0930
05/15/2024 Ditch clean out
05/15/2024 Ditch clean out2
05/15/2024 Ditch clean out3
05/15/2024 Ditch clean out4
05/15/2024 IMG_1546
05/15/2024 IMG_1545
05/15/2024 IMG_1544
05/15/2024 IMG_1541
05/15/2024 IMG_1537
05/15/2024 IMG_1543
05/15/2024 IMG_1539
05/15/2024 IMG_1538
05/15/2024 IMG_1542
05/15/2024 IMG_1536
08/14/2024 IMG_0365
08/14/2024 IMG_0366
08/14/2024 IMG_0367