Engineering Permit Application Status

SPRSW210257


In order to view fees, you need to be signed in. You will only be able to schedule inspections if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

SPRSW210257
Construction Stormwater
Closed
GONDOLA SQUARE CONDOS
New
Gondola Relocation Project
09/15/2021

Locations

Address
2305 MT WERNER CIR

Property
211077001

Permits

Permit Number: SPRSW210257-SW1

Construction Stormwater
Permit(s) Issued

Permit Number: SPRSW210257-LD1

Land Disturbance
Permit(s) Issued

Reviews

There are no reviews for this permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
45 Day Inspection Failed 9/24/2021 09/24/2021
Scott Slamal
45 Day Inspection Passed 9/20/2021 09/27/2021
Scott Slamal
45 Day Inspection Failed 10/11/2021 10/11/2021
Scott Slamal
45 Day Inspection Failed 10/13/2021 10/13/2021
Scott Slamal
45 Day Inspection Failed 10/26/2021 10/26/2021
Scott Slamal
45 Day Inspection Failed 11/4/2021 11/04/2021
Scott Slamal
45 Day Inspection Failed 4/22/2022 04/22/2022
Scott Slamal
Corrections:


Sediment Discharges
Carried Forward
04/26/2022
Install additional rocks socks to increase capacity and filtration at inlet across from old Preview Lift. Email photos of corrections once completed to Scott Slamal.

45 Day Inspection Failed 5/3/2022 05/03/2022
Scott Slamal
Corrections:


Sediment Discharges
Resolved
05/03/2022

Inlet Protection
Carried Forward
05/03/2022
Install additional Dandy Bag inlet protection at the two inlets adjacent to the new gondola terminal.

Sediment Discharges
Carried Forward
05/03/2022
Control measure implementation was inadequate to control sediment discharges to Burgess Creek.

45 Day Inspection Failed 6/2/2022 06/02/2022
Scott Slamal
Corrections:


Inlet Protection
Resolved
06/03/2022
Install additional Dandy Bag inlet protection at the two inlets adjacent to the new gondola terminal.

Sediment Discharges
Resolved
06/03/2022
Control measure implementation was inadequate to control sediment discharges to Burgess Creek.

Maintenance activities
Resolved
06/08/2022
Sediment accumulation at check dams along drainage swale at base area and at inlets needs to be removed to restore capacity at these locations. Email Scott Slamal photos once corrections are completed. Corrections made 6/3-6/7 see photo document showing corrections.

45 Day Inspection Passed 7/12/2022 07/07/2022
Scott Slamal
Corrections:


Maintenance activities
Resolved
07/08/2022
Sediment accumulation at check dams along drainage swale at base area and at inlets needs to be removed to restore capacity at these locations.

45 Day Inspection Passed 8/18/2022 08/21/2022
Scott Slamal
45 Day Inspection Passed 9/29/2022 08/31/2022
Scott Slamal
45 Day Inspection Failed 11/19/2022 10/05/2022
Scott Slamal
Corrections:


Inlet Protection
Carried Forward
10/05/2022
Install inlet protection at newly installed inlet at base of wild blue gondola terminal.

45 Day Inspection Failed 12/19/2022 11/01/2022
Scott Slamal
Corrections:


Inlet Protection
Carried Forward
11/04/2022
Install inlet protection at newly installed inlet at base of wild blue gondola terminal.

Vehicle tracking
Carried Forward
11/04/2022
FODs tracking pad was in need of maintenance. Sediment tracking was observed on Ski Time Square Dr.

45 Day Inspection Passed 4/26/2023 05/04/2023
Scott Slamal
Corrections:


Inlet Protection
Resolved
05/04/2023
Install inlet protection at newly installed inlet at base of wild blue gondola terminal.

Vehicle tracking
Resolved
05/04/2023
FODs tracking pad was in need of maintenance. Sediment tracking was observed on Ski Time Square Dr.

45 Day Inspection Passed 6/18/2023 06/16/2023
Scott Slamal
45 Day Inspection Passed 7/31/2023 07/27/2023
Scott Slamal
45 Day Inspection Passed 9/10/2023 09/08/2023
Scott Slamal
90 Day Inspection Failed 5/3/2024 05/15/2024
Scott Slamal
Corrections:


Miscellaneous
Carried Forward
05/15/2024
The practice of cleaning out accumulated sediment from check dams along the Right of Way trail while runoff is occurring is causing sediment to discharge from the base area drainage to Burgess Creek. This practice needs to be re-evaluated and only occur when runoff is not occurring in the ditch. Please respond with a narrative outlining how this will be addressed in the future.

90 Day Inspection Partial Pass 8/13/2024 08/14/2024
Scott Slamal
Corrections:


Miscellaneous
Carried Forward
08/14/2024
The practice of cleaning out accumulated sediment from check dams along the Right of Way trail while runoff is occurring is causing sediment to discharge from the base area drainage to Burgess Creek. This practice needs to be re-evaluated and only occur when runoff is not occurring in the ditch. Please respond with a narrative outlining how this will be addressed in the future.

90 Day Inspection Partial Pass 5/2/2025 05/08/2025
Scott Slamal
Final Construction Stormwater Passed 08/06/2025
Scott Slamal
90 Day Inspection Reached Final Stablization 8/6/2025 08/06/2025
Scott Slamal

Conditions

There are no conditions for this engineering permit application, or you are not authorized to view them.

Related Permit & Planning Applications

There are no related items for this engineering permit application.

Documents & Images

Date Uploaded File Type Name
11072022PRIMARYSWALEFAILURE.JPEG
11072022PRIMARYSWALEFAILURE0.JPEG
11072023BURGESS CREEK BLOW SKI TRAIL.JPEG
19EDD35B-C764-4D67-A520-6486E8E68467.JPEG
224FDAF7-00B3-4C6C-AA27-8290614B4259.JPEG
367E480F-0D1D-45F7-B45C-39BD4AC9E059.JPEG
6A4CC5EC-168B-4AC2-98DF-A6D3231415FC.JPEG
847B4B42-BDBC-4A24-A5A0-3B247FC6DE2C.JPEG
873E95AD-F6FF-42CA-A992-DAA41A30B01F.JPEG
8CE3A3CF-5C79-43D0-8372-B6D7C31C75EE.JPEG
BOTTOM OF MAIN DRAINAGE APPEARS NOT SUBSTANTIAL AND COULD JUMP .JPEG
CHRISTY BASE.JPEG
CHRISTY BASE2.JPEG
CPX BASE-BLANKETS NOT FULLY COVERING ALL DISTURBED SOILS.JPEG
DITCH CLEAN OUT.JPEG
DITCH CLEAN OUT3.JPEG
DITCH CLEAN OUT4.JPEG
F20BE086-37E9-482D-9BAC-1B7C141A9943.JPEG
FB233707-2978-4951-B42D-883DF7A693C6.JPEG
IMAGE.JPG
IMAGE0.JPG
IMAGE1.JPG
IMAGE2.JPG
IMAGE3.JPG
IMG_0365.JPEG
IMG_0366.JPEG
IMG_0367.JPEG
IMG_0578.JPEG
IMG_0579.JPEG
IMG_0581.JPEG
IMG_0582.JPEG
IMG_0624.JPEG
IMG_0920.JPEG
IMG_0921.JPEG
IMG_0922.JPEG
IMG_0925.JPEG
IMG_0927.JPEG
IMG_0928.JPEG
IMG_0930.JPEG
IMG_1348.JPEG
IMG_1352.JPEG
IMG_1536.JPEG
IMG_1537.JPEG
IMG_1539.JPEG
IMG_1542.JPEG
IMG_1543.JPEG
IMG_1545.JPEG
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT.PDF
Report INSPECTION REPORT3.PDF
NO INLET PROTECTION .JPEG
SEDIMENT BASIN-NO ECB OR STABILIZED OUTLET.JPEG
TRACKING.JPEG
VTC NEEDING MAINTENANCE .JPEG
08/18/2022 image4
08/18/2022 image5
10/05/2022 A2CE08EC-9920-4DCF-B979-109A57FE8C4B
11/03/2022 CPXGradingSlopes-hydromulch thin or sparse
11/03/2022 CPXGradingSlopes-hydromulch thin or sparse 0
11/03/2022 CPXGradingSlopes-hydromulch thin or sparse 1
11/10/2022 11072023InletFailure
05/04/2023 IMG_0577
05/12/2023 IMG_0632
05/12/2023 IMG_0627
05/12/2023 IMG_0623
07/27/2023 IMG_0926
07/27/2023 IMG_0924
07/27/2023 IMG_0923
07/27/2023 IMG_0929
07/27/2023 IMG_0931
05/15/2024 Ditch clean out2
05/15/2024 IMG_1546
05/15/2024 IMG_1544
05/15/2024 IMG_1541
05/15/2024 IMG_1538
05/08/2025 IMG_1351
05/08/2025 IMG_1350
05/08/2025 IMG_1349
08/06/2025 IMG_0608